Changing Activity ID

Different ways to change activity ID

Each element in Planera is assigned a unique alphanumeric ID by default. You can modify these IDs individually or in bulk as needed.

  • Max ID Length: 40 characters

  • Limitation: IDs starting with "A", "B", or "C" followed by numbers are reserved by the system and cannot be used. Example: A1111, B123456, C999999 and so on.

How to Change Activity ID

Activity ID can be changed from the table either individually or in bulk

  1. Individually: Double-click the Activity ID cell, then type or paste a new ID from spreadsheet


    Note: Ensure clipboard permissions are enabled for copy/paste. Learn more

  2. Bulk: There are two ways to bulk edit activity Ids

    1. Select multiple ID cells, then click on “Edit Ids”


      Enter the starting ID and set the increment value.


    2. Select multiple activities, click "Find and Replace," and choose "Element IDs."



      In the first field, enter the part of the ID to replace, and in the second field, enter the replacement text.


      Learn more about Bulk Entry here