Adding Images to the Canvas

How to add activities from Gantt view

The Image Embed feature allows you to add, view, and interact with images directly within the Canvas for better project context and collaboration.

Supported Formats:

  • JPG, PNG, SVG, WEBP

  • Max file size: 50 MB

  • Max resolution: 32 MP

Ways to Add an Image

There are 3 ways to add an image to the canvas:

  1. Copy & Paste

    1. Copy an image from your device or web, then Right-click on the Canvas and select Paste Image, or press Ctrl+V (Windows) / Cmd+V (Mac)


    2. Once loaded, the image appears selected

      1. Drag edges to resize

      2. Drag to move

      3. Open in a resizable side panel

      4. Open in a new window

      5. Press Delete to remove


  2. From the Right-Click Menu

    1. Right-click on any empty area of the Canvas and select ‘Image’ from the menu


    2. Upload a file or drag and drop it into the popup

    3. Once uploaded, the image will appear in a selected state. You can perform the action as mentioned above


  3. From the Left Toolbar:

    1. Click on Embed from the Left Toolbar

    2. Click anywhere on the Canvas where the image should appear


    3. Upload a file or drag and drop it into the popup

    4. Once uploaded, the image will appear in a selected state. You can perform the action as mentioned above