Skip to main content

Integrated Quality Score

How to run a quality check on your schedule based on the DCMA criteria

Updated over 3 months ago

View the Quality Score in a resizable side panel that will stay open as you navigate between the Canvas, Table, and Gantt views. This lets you refer to the quality score criteria while inspecting activities that affect your score at the same time.

How to Run the Quality Check

You can access the Quality Score 2 ways:

  1. Run the schedule and click Improve Score.

  2. Click the More button on the top right of the screen and select Schedule Quality Check from the drop-down menu.

Click the magnifying glass icon next to any category that did not pass to Inspect Elements affecting your score. This will apply filters and bring you to the first activity that affects the category you are inspecting

Click the right filter arrow to cycle through each element and make any necessary changes to improve your score

To make corrections to another quality category, click the magnifying glass next to a new category and click Continue to update the filters and inspect the filtered elements to make updates

To close the quality check and remove all filters, click Stop next to the category you are inspecting in the side panel.

Quality Check in Any View

The Quality check can be ran in the canvas, table or Gantt view and will stay open if you navigate between views. You can also resize the panel.

Understanding your Quality Score

The top 8 categories shown on the side panel measure the network structure and relationships of your schedule. These values affect your Quality Score. You can learn more about each category by hovering over the info icon.

The 6 categories at the bottom of the side panel measure project performance and to not impact the Quality Score.

Did this answer your question?